DISTRICT OPERATIONS DEPARTMENT
FY 2008-2009
Staffing Request:
Additional staff needed in:
Grounds:  Salaried Grounds Supervisor $45,000
      Includes Benefits $45,000
Brandon Elementary:
Replace quad hand wash fountain (located by Carpet Gym) $7,500
Remove and replace floor file ('39 entrance and gym hallway) 28,000
Replace 5 doors in the 1939 addition 10,000
Install video surveillance system 25,000
Renovation of Wood Gym Restrooms 25,000
Remove and Replace Carpet (South Classrooms) 60,000
Remove grill and close opening (South end - ECH area) 2,000
Total BE $157,500
High School:
Reposition/mount mascot in different location $1,000
Replace vanities, sinks, and faucets  - Stall partitions in all restrooms not recently remodeled 20,000
Air condition servery 20,000
Down-size PAC exterior overhead door 3,000
Change out Energy Management System (EMS) Head End to Web Based 18,000
Remodel Trainer's area into Orchestra storage 2,000
Replace main East entrance doors and frame 41,000
Total  HS $105,000
Middle School:
Upgrade lighting in original gym, media center, common areas $20,000
Upgrade Energy Management Controls 120,000
Upgrade video surveillance system 8,000
Total MS $148,000
Robert Bennis Elementary:
Install security access at all exterior doors on educational wing $22,000
Total RBE $22,000
Valley Springs Elementary:
Upgrade electrical panel $10,000
Upgrade gym lighting 2,500
Total VSE $12,500
Grounds:  
Purchase Bobcat Toolcat Utility-Work Machine-Base Unit w/bucket & heated hardcab $34,000
Purchase Bobcat Toolcat Broom attachment 3,700
Purchase Bobcat Toolcat Snow Blower attachment 4,500
Purchase 60" riding mower - 31 HP 15,000
Purchase Frontline mower 18,000
Purchase Snow Blower attachment 4,500
Purchase Broom attachment 3,500
Purchase Graco Field Lazer Field Striper with attachment 2,100
Purchase small lawn care equipment 2,000
Purchase used walk behind mower and ride on sprayer 4,500
Total Grounds $91,800
Transportation:
**Determine routing strategies with the inclusion of new elementary school
Purchase two replacement buses $180,000
Purchase one 7-passenger mini-van 25,000
Purchase one 3/4 ton pick-up 26,000
Total Trans $231,000
Physical Plant:
ADA Compliance $5,000
Security needs 50,000
Print Shop Operations 70,000
Concrete/Asphalt Repairs where work is needed: 95,000
  BE:     N. Exit to Bus - Wider - Straight
            S side East wing - Asphalt between sidewalk and building
            S side East wing - Asphalt from single door to double doors-south
            Parking lot repairs - patches, repair, replace
  VSE:  Cut out cracks/repair
Remodel Bank Building/Furnishings 250,000
Remodel Central Office for HS Rooms 220,000
Carpet 58,000
Demo walls 25,000
Install new heating system 40,000
Replace ceiling tile 34,000
Construct new walls 25,000
Electrical 18,000
Furnishings 20,000
Purchase Maintenance Request Software 3,000
Custodial Equipment 40,000
Install irrigation in new Football/Band Practice Field @ HS 25,000
Acquisition of land for future building site 400,000
Contingency 50,000
Total Physical Plant $1,208,000
  TOTAL FY 2008-2009 $2,020,800
*Child Nutrition Services:    
Convection Double Stack Oven $8,800
Steamer 15,000
One holding unit 7,500
Two Upright racks 500
One Hot Food cart 5,000
One Cold Food cart (non-refrigerated) 2,000
Commercial Clothes Washer and Dryer 850
      *Total CNS $39,650 1/29/2008