| DISTRICT OPERATIONS DEPARTMENT |
| FY 2008-2009 |
|
|
|
|
| Staffing
Request: |
|
|
|
| Additional
staff needed in: |
|
|
|
|
|
Grounds: Salaried Grounds Supervisor |
|
|
$45,000 |
|
|
Includes Benefits |
$45,000 |
|
|
|
| Brandon
Elementary: |
|
|
|
| Replace
quad hand wash fountain (located by Carpet Gym) |
|
$7,500 |
|
| Remove and replace floor file ('39 entrance and gym hallway) |
|
28,000 |
|
| Replace 5 doors in the 1939 addition |
|
|
10,000 |
|
| Install video surveillance system |
25,000 |
|
| Renovation
of Wood Gym Restrooms |
|
25,000 |
|
| Remove and
Replace Carpet (South Classrooms) |
|
60,000 |
|
| Remove grill and close opening (South end - ECH area) |
2,000 |
|
|
Total BE |
|
|
$157,500 |
|
|
|
|
|
| High
School: |
|
|
|
|
| Reposition/mount
mascot in different location |
|
|
$1,000 |
|
| Replace vanities, sinks, and faucets - Stall partitions in all restrooms not
recently remodeled |
|
20,000 |
|
| Air
condition servery |
|
|
20,000 |
|
| Down-size
PAC exterior overhead door |
|
|
3,000 |
|
| Change out
Energy Management System (EMS) Head End to Web Based |
18,000 |
|
| Remodel
Trainer's area into Orchestra storage |
|
|
2,000 |
|
| Replace
main East entrance doors and frame |
|
|
41,000 |
|
|
Total HS |
|
|
$105,000 |
|
|
|
| Middle
School: |
|
|
|
| Upgrade
lighting in original gym, media center, common areas |
|
$20,000 |
|
| Upgrade
Energy Management Controls |
|
120,000 |
|
| Upgrade
video surveillance system |
|
|
8,000 |
|
|
Total MS |
|
|
$148,000 |
|
|
|
|
|
| Robert
Bennis Elementary: |
|
|
|
| Install
security access at all exterior doors on educational wing |
|
$22,000 |
|
|
Total RBE |
|
$22,000 |
|
|
|
|
|
| Valley
Springs Elementary: |
|
|
|
| Upgrade
electrical panel |
|
$10,000 |
|
| Upgrade
gym lighting |
|
2,500 |
|
|
|
Total VSE |
|
$12,500 |
|
|
|
| Grounds: |
|
|
|
| Purchase
Bobcat Toolcat Utility-Work Machine-Base Unit w/bucket
& heated hardcab |
$34,000 |
|
| Purchase
Bobcat Toolcat Broom attachment |
|
3,700 |
|
| Purchase
Bobcat Toolcat Snow Blower attachment |
|
4,500 |
|
| Purchase
60" riding mower - 31 HP |
|
15,000 |
|
| Purchase
Frontline mower |
|
18,000 |
|
| Purchase
Snow Blower attachment |
|
4,500 |
|
| Purchase
Broom attachment |
|
3,500 |
|
| Purchase
Graco Field Lazer Field Striper with attachment |
|
2,100 |
|
| Purchase
small lawn care equipment |
|
2,000 |
|
| Purchase
used walk behind mower and ride on sprayer |
|
4,500 |
|
|
Total Grounds |
|
$91,800 |
|
|
|
|
|
| Transportation: |
|
|
|
| **Determine routing strategies with the inclusion of new
elementary school |
|
| Purchase
two replacement buses |
|
$180,000 |
|
| Purchase
one 7-passenger mini-van |
|
25,000 |
|
| Purchase
one 3/4 ton pick-up |
|
26,000 |
|
|
Total Trans |
|
$231,000 |
|
|
|
| Physical
Plant: |
|
|
|
| ADA
Compliance |
|
$5,000 |
|
| Security
needs |
|
50,000 |
|
| Print
Shop Operations |
|
70,000 |
|
| Concrete/Asphalt
Repairs where work is needed: |
|
95,000 |
|
| BE:
N. Exit to Bus - Wider - Straight |
|
|
|
| S side East wing - Asphalt
between sidewalk and building |
|
|
| S side East wing - Asphalt from
single door to double doors-south |
|
|
| Parking lot repairs - patches,
repair, replace |
|
|
|
| VSE:
Cut out cracks/repair |
|
|
|
| Remodel
Bank Building/Furnishings |
|
250,000 |
|
| Remodel
Central Office for HS Rooms |
|
220,000 |
|
|
Carpet |
|
58,000 |
|
|
|
|
Demo walls |
|
25,000 |
|
|
|
|
Install new heating
system |
40,000 |
|
|
|
|
Replace ceiling tile |
|
34,000 |
|
|
|
|
Construct new walls |
|
25,000 |
|
|
|
|
Electrical |
|
18,000 |
|
|
|
|
Furnishings |
|
20,000 |
|
|
|
| Purchase
Maintenance Request Software |
|
3,000 |
|
| Custodial
Equipment |
|
40,000 |
|
| Install
irrigation in new Football/Band Practice Field @ HS |
|
25,000 |
|
| Acquisition
of land for future building site |
|
400,000 |
|
| Contingency |
|
50,000 |
|
|
Total Physical Plant |
$1,208,000 |
|
|
|
|
|
|
TOTAL FY 2008-2009 |
$2,020,800 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| *Child
Nutrition Services: |
|
|
|
|
|
| Convection
Double Stack Oven |
|
$8,800 |
|
|
|
| Steamer |
|
|
15,000 |
|
|
|
| One
holding unit |
|
|
7,500 |
|
|
|
| Two
Upright racks |
|
|
500 |
|
|
|
| One
Hot Food cart |
|
|
5,000 |
|
|
|
| One
Cold Food cart (non-refrigerated) |
|
2,000 |
|
|
|
| Commercial
Clothes Washer and Dryer |
|
850 |
|
|
|
| |
|
|
*Total CNS |
$39,650 |
|
|
1/29/2008 |
|
|
|
|
|
|
|
|
|